Wiring substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11871515
SERIAL NO

17488373

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wiring substrate includes an insulating layer having a through hole, a first conductor layer formed on a first surface of the insulating layer, a second conductor layer formed on a second surface of the insulating layer, an interlayer connection conductor formed in the through hole such that the interlayer connection conductor is connecting the first and second conductor layers, and a resin body formed in the through hole of the insulating layer such that a volume occupancy rate of the resin body is in a range of 30% to 55% in the through hole. The interlayer connection conductor is formed such that the interlayer connection conductor has a length in a range of 1000 μm to 2000 μm in a thickness direction of the insulating layer and that a volume occupancy rate of the interlayer connection conductor is in a range of 45% to 70% in the through hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IBIDEN CO LTD1 KANDACHO 2-CHOME OGAKI-SHI GIFU 503-8604

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawai, Satoru Ogaki, JP 76 466
Kimishima, Yasuki Ogaki, JP 10 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00