Signaling and procedures for fast and low overhead handover for MU MIMO systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11382139
SERIAL NO

16900572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A User Equipment (UE) measures the signal quality of a dedicated downlink reference signal transmitted by a Base Station (BS) to the UE. If the signal quality is below a threshold, the UE initiates a measurement procedure to determine a target handover BS. The UE sequentially transmits an uplink reference signal on each of UE's beams. The BSs estimate the Angle of Arrival (AoA) of any received uplink reference signal, form a dedicated downlink beam pointed toward the AoA and transmit an acknowledgment to the UE on the corresponding beam. The UE estimates the signal quality of the received acknowledgements on the different UE beams, and transmits a handover message on the UE beam on which the acknowledgement with the highest signal quality is received The acknowledgement comprises a preamble, spread using a pseudo-noise sequence specific to each BS.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JALALI AHMADRANCHO SANTA FE CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jalali, Ahmad Rancho Santa Fe, US 157 7008

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 5, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00