Method for producing a hand orthosis and hand orthosis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11351052
APP PUB NO 20220000649A1
SERIAL NO

17479687

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a hand orthosis, including the steps of: Producing an impression of at least one finger of a patient's hand and at least a part of a forearm, producing a finger section from a reproduction based on the impression, incorporating at least one finger segment in the finger section side corresponding to the hand surface, detecting the physiology of the patient's forearm using at least one captured image from the reproduction together with the finger section, thereby producing a digital 3D model, generating a rail based on the produced digital 3D model, securing at least one force-introducer onto or into the rail, securing a proximal end of the at least one finger segment to a distal end of the rail, and coupling the at least one force-introducer to the at least one finger segment. A hand orthosis is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HKK BIONICS GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hepp, Dominik Jettingen-Scheppach, DE 2 4
Knobloch, Tobias Ulm, DE 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00