Fuze comprising a self-destruction device for a gyratory projectile

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11933594
APP PUB NO 20230133860A1
SERIAL NO

17917784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a fuze for a gyratory projectile, including a striker holder movable about a rocker axis perpendicular to the axis of symmetry of the fuze, a primer holder rotatable about an axis of rotation parallel to the axis of symmetry, and a self-destruction device. The latter includes an SD mechanism using the linear acceleration of the projectile upon the departure of the shot to store axial kinetic energy, and a safety mechanism using the centrifugal effects of the projectile during the flight to store radial kinetic energy. The two mechanisms cooperate with each other, and with the striker holder and the primer holder to generate the different storage positions before firing, intermediate upon the departure of the shot, cocked during the flight and of self-destruction at the end of the flight, guaranteeing maximum safety of the projectile in the storage position and maximum responsiveness of the projectile regardless of the scenario encountered during ballistic firing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DIXI MICROTECHNIQUES

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dubois, Sébastien Besancon, FR 26 83
Guyon, Philippe Besancon, FR 4 87
Lemercier, Florent Besancon, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00