Battery controller and method of battery control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10752127
SERIAL NO

16709022

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery controller of an embodiment includes an auxiliary battery, a connection control unit, a calculating unit, and a balancing control unit. The auxiliary battery is a lithium ion secondary battery that is connectable to or disconnectable from an auxiliary power line of a vehicle. The connection control unit disconnects the battery from the auxiliary power line under a certain condition of the vehicle. The calculating unit calculates the state of charge of the battery when the battery is disconnected by the connection control unit. The balancing control unit executes balancing control to equalize the amount of charge between cells of the battery when the battery is disconnected by the connection control unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO TEN LIMITED2-28 GOSHO-DORI 1-CHOME HYOGO-KU KOBE HYOGO 652-8510

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyake, Ryuusuke Kobe, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 25, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00