Electrical power distribution and monitoring system for data

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11942266
SERIAL NO

17692734

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems for improvements in electrical power distribution and monitoring systems for data centers. A system can include a circuit breaker, a set of phased current transformers (CTs), a neutral CT, and a metering device. The circuit breaker can be mounted in a first enclosure. Additionally, the set of phased CTs can be positioned in a first component arrangement of a second enclosure. The set of phased CTs can be coupled to the circuit breaker and be configured to measure a current value flowing through the circuit breaker. Moreover, the neutral CT can be positioned in a second component arrangement of the second enclosure. The neutral No errors found. CT can be coupled to the circuit breaker. Furthermore, the metering device can be configured to transmit data associated with the current value to a display device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UBER TECHNOLOGIES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kyaagba, Tor Adom San Francisco, US 1 0
Thies, Paul Christopher Mountain View, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00