Method of manufacturing a semiconductor structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11659707
APP PUB NO 20220216213A1
SERIAL NO

17655791

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a semiconductor structure includes providing a substrate having an active region surrounded by an isolation layer; forming a first trench and a second trench in the active region, and a third trench and a fourth trench in the isolation layer; forming a bottom work-function layer in the third trench and the fourth trench, respectively; forming a middle work-function layer on the bottom work-function layer and in the first and the second trenches; forming a top work-function layer on the middle work-function layer; and forming a capping layer on the top work-function layer that fills a remaining region of the first, the second, the third and the fourth trenches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NANYA TECHNOLOGY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Ching-Chia Taipei, TW 20 34
Liao, Wei-Ming Taoyuan, TW 41 286

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00