Alumina bound catalyst for selective conversion of oxygenates to aromatics

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10099209
APP PUB NO 20150174562A1
SERIAL NO

14560070

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A catalyst composition comprising a zeolite, an alumina binder, and a Group 12 transition metal selected from Zn and/or Cd, the zeolite having a Si/Al ratio of at least about 10 and a micropore surface area of at least about 340 m2/g, the catalyst composition comprising about 50 wt % or less of the binder, based on a total weight of the catalyst composition, and having a micropore surface area of at least about 290 m2/g, a molar ratio of Group 12 transition metal to aluminum of about 0.1 to about 1.3, and at least one of: a mesoporosity of about 20 m2/g to about 120 m2/g; a diffusivity for 2,2-dimethylbutane of greater than about 1×10−2 sec−1 when measured at a temperature of about 120° C. and a 2,2-dimethylbutane pressure of about 60 torr (8 kPa); and a combined micropore surface area and mesoporosity of at least about 380 m2/g.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EXXONMOBIL RESEARCH AND ENGINEERING COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Loveless, Brett Maplewood, US 11 57
McCarthy, Stephen J Center Valley, US 80 701
Vijay, Rohit Bridgewater, US 19 166

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00