Charged particle beam control during additive layer manufacture

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11318555
APP PUB NO 20190358737A1
SERIAL NO

16478293

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer-implemented method of generating scan instructions for forming a product using additive layer manufacture as a series of layers is provided. The method comprises determining a beam acceleration voltage to be used when forming the product; for each hatch area of layers of the product, determining a respective beam current to be used when forming the hatch area and providing a respective beam current value to the hatch area description in the scan pattern instruction file; and for each line of each hatch area, determining a respective beam spot size to be used when scanning the beam along the line and providing a respective beam spot size value to the line description in the scan pattern instruction file, and determining a respective series of beam step sizes and beam step dwell times to be used when scanning the beam along the line, and providing a respective series of beam position values and beam step dwell times to the line description in the scan pattern instruction file thereby defining how the beam is to be scanned along the line. Also provided are a file of scan instructions, an additive layer manufacture apparatus, and a method of forming a product using the additive layer manufacturing apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RELIANCE RG LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ian, Laidler Yorkshire, GB 1 2
McClelland, Andrew Cambridgeshire, GB 11 20
Phil, Hoyle Cambridgeshire, GB 1 2
Richardson, William Thomas Yorkshire, GB 4 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00