Device for additive production of three-dimensional objects

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11911959
APP PUB NO 20180257140A1
SERIAL NO

15916855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device (1) for the additive production of three-dimensional objects (2) by successive, layered, selective irradiation and accompanying successive, layered, selective solidification of construction material layers of a construction material (3) that can be solidified by means of an energy beam, comprising: a plurality of irradiation devices (6 and 7), which are designed to generate an energy beam, a control device (16), which is designed to generate control information controlling the operation of the irradiation devices (6 and 7) and to control the operation of the irradiation devices (6 and 7) on the basis of generated control information, wherein the control device (16) is designed to generate first control information in order to control the operation of a first irradiation device, on the basis of which the first irradiation device generates a first energy beam (4a) for the successive, layered, selective solidification of a construction material layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CONCEPT LASER GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Döhler, Tim Großheirath, DE 15 37
Pontiller-Schymura, Peter Neudrossenfeld, DE 24 34
Trutschel, Felix Küps, DE 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00