Power semiconductor device and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11967631
SERIAL NO

18497588

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a power semiconductor device and a manufacturing method thereof. In order to provide a power semiconductor device with improved latch-up immunity but without increasing device power loss and costs, a hole current path in a fourth semiconductor region of a first conductivity type between a gate trench and a dummy gate trench is shortened by providing a first contact trench between two adjacent gate trenches, and providing a second contact trench between the gate trench and a dummy gate trench such that the width and depth of the second contact trench are respectively greater than those of the first contact trench. The effect of the hole current on the potential rise of the fourth semiconductor region of the first conductivity type is suppressed, thereby suppressing the latch-up effect, and enhancing the switching reliability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JSAB TECHNOLOGIES (SHENZHEN) LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deng, Jing Shenzhen, CN 32 57
Feng, Hao Shenzhen, CN 116 1073
Liu, Yong Shenzhen, CN 1107 23171
Sin, Johnny Kin On Shenzhen, CN 22 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00