Trench gate device and method for making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11527633
SERIAL NO

17217173

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a trench gate device includes: forming a trench in a substrate with a super junction structure; forming a gate dielectric layer in the trench; forming a polysilicon gate by filling a portion of the trench with polysilicon; forming an intermediate dielectric layer in the trench; forming an auxiliary polysilicon layer by filling a gap in the trench with polysilicon; forming a source region of the trench gate device in the substrate; depositing an interlayer dielectric layer, and forming contacts in the interlayer dielectric layer, wherein the polysilicon gate, the auxiliary polysilicon layer, and the source region are led out from the contacts; and connecting the led-out auxiliary polysilicon layer to the led-out source region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHANGHAI HUAHONG GRACE SEMICONDUCTOR MANUFACTURING CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhao, Longjie Shanghai, CN 7 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00