Semiconductor device and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11205704
APP PUB NO 20210175337A1
SERIAL NO

16768603

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Because of inclusion of: a source electrode that is formed on a front surface of a semiconductor substrate and that is joined to the semiconductor substrate both at a source electrode as a first contact region that is an ohmic contact region and at a source electrode as a second contact region that is a contact region with a non-ohmic contact or the like; a back-surface electrode formed on a back surface of the semiconductor substrate; and a through hole in which an interconnection is provided that connects the source electrode as the second contact region in the source electrode with the back-surface electrode; it is possible not only to improve the corrosion resistance but also to reduce the leakage current, so that a highly-reliable semiconductor device suited for high frequency operation is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsunami, Daisuke Tokyo, JP 8 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00