Basin and high speed air solution

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11517948
APP PUB NO 20190275570A1
SERIAL NO

16319247

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One embodiment provides a rinse basin and blower system configured to clean a pipette including: a rinse basin comprising: a hollow tube enclosed at one end; wherein the hollow tube comprises an upper port and a lower port; and the lower port being tapered toward the hollow tube; and wherein the rinse basin is connected to a blower system; the blower system comprising: a waste reservoir that receives, from the rinse basin, a waste product comprising: air and liquid, wherein the waste reservoir separates the liquid from the air; a dryer that receives the air from the waste reservoir and further separates any remaining liquid from the air; and a blower that receives the air from the dryer and exhausts the air.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIEMENS HEALTHCARE DIAGNOSTICS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patel, Shriram Saddle Brook, US 2 0
Pronkine, Viatcheslav Palisades, US 10 273
Shishkin, Dimitri Whippany, US 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00