User equipment and method for scheduling timeline for cancelling uplink transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11683830
SERIAL NO

17382874

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A user equipment and a method for scheduling a timeline for cancelling uplink (UL) transmission are provided. The method includes: transmitting a low priority UL channel scheduled by a first downlink control information (DCI) format; receiving a second DCI format scheduling a high priority UL channel; and cancelling transmission of the low priority UL channel and transmitting the high priority UL channel in response to determining that the high priority UL channel overlaps in time with the low priority UL channel, wherein a starting time of the high priority UL channel and an ending time of the second DCI format are separated by an offset greater than an absolute time duration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FG INNOVATION COMPANY LIMITEDTUEN MUN NEW TERRITORIES

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Hai-Han Taipei, TW 83 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00