Method for making thin film transistor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9397306
APP PUB NO 20160149146A1
SERIAL NO

15007650

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thin film transistor is provided. The thin film transistor includes a source electrode, a drain electrode, a semiconductor layer, an insulating layer and a gate electrode. The drain electrode is spaced from the source electrode. The semiconductor layer is electrically connected to the source electrode and the drain electrode. The gate electrode is insulated with the source electrode, the drain electrode and the semiconductor layer by the insulating layer. The gate electrode, the source electrode, and the drain electrode comprise a plurality of first carbon nanotubes. The semiconductor layer comprises a plurality of second carbon nanotubes. A distribution density of the plurality of first carbon nanotubes is about 20 times as much as that of the plurality of second carbon nanotubes. A number of the plurality of second carbon nanotubes in 1 square micrometers is smaller than or equal to 1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HON HAI PRECISION INDUSTRY CO., LTD.;TSINGHUA UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Shou-Shan Beijing, CN 1511 11402
Li, Qun-Qing Beijing, CN 326 1672
Zou, Yuan Beijing, CN 7 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00