Submersible power plant for producing electrical power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11542908
SERIAL NO

17416187

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A submersible power plant and a method for providing a submersible power plant. The submersible power plant includes an anchoring provided at a minimum depth and a vehicle including at least one wing. The vehicle is arranged to be secured to the anchoring by at least one tether rotatably attached to the anchoring by an anchoring coupling and attached to the vehicle by at least one vehicle coupling. The submersible power plant is completely submerged in a body of fluid both during operation and non-operation of the submersible power plant and the tether has an unextended tether length between 2-20 times a wingspan of the wing, specifically between 3-12 times the wingspan of the wing, more specifically between 5-10 times the wingspan of the wing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MINESTO AB

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergqvist, Björn Gothenburg, SE 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 3, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00