Passive horn integrally formed by using thermoplastic vulcanized rubber and preparation method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11780131
SERIAL NO

17464130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A passive horn integrally formed using thermoplastic vulcanized rubber includes a first outer casing, a second outer casing, an inner casing and an iron piece. The first outer casing includes a sealing ring, a folding ring and a vibrating membrane, and the sealing ring, the folding ring and the vibrating membrane are integrally injection molded into the first outer casing. A groove is disposed in the second outer casing, and the first outer casing is disposed in the groove. The back surface of the vibrating membrane is provided with a casing groove sequentially embedded with the inner casing and the iron piece. Furthermore, a preparation method of a passive horn integrally formed using thermoplastic vulcanized rubber, which, under the condition of integrated injection molding, may improve the yield rate, ensure product quality, save assembly time and labor cost, and improve production efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TYMPHANY ACOUSTIC TECHNOLOGY (HUIZHOU) CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cen, Shuhong Huizhou, CN 3 1
Ho, Cheng Huizhou, CN 7 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00