Hydraulic alternating system for agricultural baler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995319
APP PUB NO 20170089363A1
SERIAL NO

15142790

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic circuit includes a control valve, a first hydraulic actuator, and a second hydraulic. The hydraulic circuit is configured such that in a first step, the first hydraulic actuator opens a product barrier in response to movement of the control valve into a first position, in a second step, the second hydraulic actuator moves a product engagement member in a first direction and the first hydraulic actuator closes the product barrier in response to movement of the control valve into a second position, in a third step, the first hydraulic actuator opens the product barrier in response to movement of the control valve into the first position, and in a fourth step, the second hydraulic actuator moves the product engagement member in a second direction and the first hydraulic actuator closes the product barrier in response to movement of the control valve into the second position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DEERE & COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anstey, Henry D Ottumwa, US 64 683
Jones, Austin J Ottumwa, US 20 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00