Method for determining the overload capacity of a high-voltage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11894181
APP PUB NO 20200312538A1
SERIAL NO

16825423

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method determines the overload capacity of a high-voltage device. The method includes creating a load forecast request for a predefined time period, determining an operational state of the high-voltage device by obtaining state parameters, transmitting the load forecast request and the state parameters at a request time to a load-forecasting model, and determining the maximum utilization in the predefined time period by the load-forecasting model, with which the overload capacity of a high-voltage device can be fully exploited. A lifetime consumption of the high-voltage device before the request time is derived from measured values by obtaining an actually consumed lifetime and the actually consumed lifetime is fed to the load-forecasting model as a state parameter. The load-forecasting model then determines the maximum overload capacity depending on the actually consumed lifetime.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fritsche, Ronny Nuremberg, DE 5 0
Hammer, Thomas Schwabach, DE 54 917
Kuestermann, Matthias Nuremberg, DE 6 0
Raith, Johannes Passail, AT 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 6, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00