FUSI gated device formation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11823959
SERIAL NO

17406276

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments of the present disclosure are directed towards an integrated chip including a gate dielectric structure over a substrate. A metal layer overlies the gate dielectric structure. A conductive layer overlies the metal layer. A polysilicon layer contacts opposing sides of the conductive layer. A bottom surface of the polysilicon layer is aligned with a bottom surface of the conductive layer. A dielectric layer overlies the polysilicon layer. The dielectric layer continuously extends from sidewalls of the polysilicon layer to an upper surface of the conductive layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yi-Huan Hsin Chu, TW 55 76
Chou, Chien-Chih New Taipei, TW 78 276
Kalnitsky, Alexander San Francisco, US 269 2525
Lin, Ta-Wei Minxiong Township, TW 48 243
Thei, Kong-Beng Pao-Shan Village, TW 230 3129
Tuan, Hsiao-Chin Taowan, TW 53 547
Wu, Chia-Hong Taichung, TW 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00