Battery control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11750014
APP PUB NO 20230010942A1
SERIAL NO

17507145

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery control system and method selectively connect battery strings to one or more conductive buses by plural electrically controllable switches. The switches are controlled to one or more of (a) connect the strings with one or more of the load or the power source via the one or more conductive buses in a first sequence and/or (b) disconnect the strings from one or more of the load or the power source via the one or more conductive buses in a second sequence. The first sequence and the second sequence are based on one or more of states of charge between the strings, different charge capacities between the strings, different electric currents conducted through the strings, different polarities of the electric currents conducted through the strings, and/or a speed of a vehicle that is powered by the one or more loads.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TRANSPORTATION IP HOLDINGS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burkell, Neil Erie, US 9 5
Kumar, Ajith Kuttannair Erie, US 415 8411
Pressman, Jacob Erie, US 11 9
Worden, Bret Erie, US 49 226

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00