Hydraulic block of an electrohydraulic power-assisted brake

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11273814
APP PUB NO 20200216049A1
SERIAL NO

16648575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic block, the upper side of which is provided with a brake-fluid reservoir which is fixed in place on the front surface and on the rear surface of the block by fastening apparatus/device (arrangement). The front fastening apparatus/device (arrangement) is formed by a tab that projects from the underside of the reservoir, this tab being screwed to the front surface of the block. The rear fastening apparatus/device (arrangement) is made up of a tab, which projects from the rear side of the reservoir and is formed by a hook that is supported by a carrier that is fastened to the rear side of the hydraulic block and forms a support for the tab, as well as a clamp, which connects the tab to the hook.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROBERT BOSCH GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alili, Amine Gasny, FR 3 5
Jean, Louis Mickenson Dammartin-en-Goële, FR 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00