PV inverter apparatus with energy storage capability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11777336
APP PUB NO 20230246477A1
SERIAL NO

17876835

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for providing AC power to a power grid using renewable energy sources as well as energy storage devices. A control system controls multiple DC/DC converters that are coupled to renewable energy sources as well as to one or more energy storage devices. The control system also controls the charge/discharge of the energy storage devices. Each DC/DC converter control block in the control system automatically detects whether to perform MPPT on the renewable energy source or to control the discharge of the energy storage devices. Each DC/DC converter control block ensures that power from the renewable energy source or from the energy storage device is converted and provided to the power grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SPARQ SYSTEMS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jain, Praveen Kingston, CA 81 1475
Pahlevaninezhad, Majid Kingston, CA 51 271

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00