Composite cable including collective braided shield

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11664138
SERIAL NO

17522856

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite cable includes a signal transmission cable including a pair of signal lines being arranged parallel to each other in a cable longitudinal direction and contacting to each other and a shield layer covering the pair of signal lines together, a pair of power supply lines being arranged contacting to each other and contacting to the shield layer, a collective braided shield covering around a cable core composed of the signal transmission cable and the pair of power supply lines collectively, a sheath covering around the collective braided shield. The collective braided shield is configured closely contacting to the shield layer in accordance with an outer shape of the shield layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PROTERIAL, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Detian Tokyo, JP 76 147
Komuro, Takanori Tokyo, JP 16 130
Watanabe, Takanobu Tokyo, JP 74 248

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00