Pre-assembled, self contained, portable fluid storage tank and method of handling flowback fluids from a hydrocarbon production operation using said tank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11794989
SERIAL NO

17441274

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Pre-assembled, self-contained, portable tank and method of using the tank for storing backflow fluids during hydrocarbon production operations. Tank is rapidly deployable and has a collapsible and refillable bladder for storing approximately 50,000 gallons or 1200 BBLS of fluids and a secondary containment with a holding capacity 120% of that of the bladder. When closed for transport, the tank is sufficiently compact and light to be movable with a light body pickup truck with an accompanying trailer over public roadways. After delivery to a site, a crew of two to five persons can set-up the tank for use within about 20 to 120 minutes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Archer,, Jr Jeffery Kevin Houston, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00