Cu-doped Sb-Te system phase change material, phase change memory and preparation method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11807798
APP PUB NO 20230287253A1
SERIAL NO

17928932

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Cu-doped Sb2Te3 system phase change material, a phase change memory, and a preparation method thereof belonging to the technical field of micro-nano electronics are provided. A Sb—Te system phase change material is doped with Cu element to form Cu3Te2 bonds with both tetrahedral and octahedral structures in the case of local enrichment of Cu. The strongly bonded tetrahedral structure improves the amorphous stability and data retention capability of the Sb—Te system phase change material, and the octahedral structure of the crystal configuration improves the crystallization speed of the Sb—Te system phase change material. A phase change memory including the phase change material and a preparation method of the phase change material are also provided. Through the phase change material provided by the invention, both the speed and amorphous stability of the device are improved, and the comprehensive performance of the phase change memory is also enhanced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAZHONG UNIVERSITY OF SCIENCE AND TECHNOLOGY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Xiaomin Hubei, CN 14 83
Miao, Xiangshui Hubei, CN 41 75
Zeng, Yuntao Hubei, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00