Operating method of controller and memory system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11269765
APP PUB NO 20200387445A1
SERIAL NO

16707851

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments generally relate to a semiconductor device, and more particularly, to an operating method of a controller and a memory system. In accordance with an embodiment of the present disclosure, an operating method of a controller for controlling a nonvolatile memory device including a plurality of memory blocks may include: generating High Performance Booster (HPB) data based on Logical to Physical (L2P) map data and storing the HPB data into at least one empty page included in a first memory block; assigning a second memory block when a number of empty pages included in the first memory block becomes smaller than a threshold number; and migrating HPB data, which is selected according to a predetermined criterion among the HPB data stored in the first memory block, into the second memory block, wherein at least a part of the HPB data is cached into a memory of a host.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SK HYNIX INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byun, Eu Joon Gyeonggi-do, KR 79 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00