Bilge system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11745830
APP PUB NO 20200391825A1
SERIAL NO

16442041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bilge pump system for removing residual fluid from a vessel surface, includes at least one collection unit having a collection base with a collection inlet and a collection outlet, and a pump having a pump inlet flow-connected by at least one tube to the collection outlet. A discharge tube is flow-connected to the pump outlet, wherein the collection inlet comprises at least one opening on a bottom face of the collection base arranged to be on the vessel surface. A sponge is arranged within the opening of the collection base and in liquid communication with the vessel surface. The sponge can be fitted into place by lips or lugs protruding from the collection base.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEAFLO MARINE & RV NORTH AMERICA, LL.C

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cirillo, Joseph Manalapan, US 4 2
Grassi, Zachary Freehold, US 3 0
Kapsaskis, Christopher Freehold, US 3 0
Kosowski, John Oak Brook, US 3 0
Yaoru, Ye Xiamen, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00