Condenser framework

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11308065
APP PUB NO 20210232560A1
SERIAL NO

16773138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In entity transition from legacy systems to a big data distributed data platform, numerous system-based architectural gaps have surfaced. There exists a need for a bridge component for each of the architectural gaps in order to support the entity transition to the big data distributed data platform. These bridge components include a variety of frameworks that are configured to automate certain processes that are needed for the transition. These processes have only become necessary as a result of the Hadoop platform. The automated processes include a snapshot load platform. The snapshot load platform enables the addition of a new view to the historical tables. The platform includes replacing the entire table in a truncated scenario. The platform includes replacing cases in a refresh or update scenario.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BANK OF AMERICA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goddard, Douglas J Addison, US 5 13
Hazboun, Paul Eric Flower Mound, US 12 15
Konduru, Sudheer Dallas, US 4 13
Mateti, Sravan Dallas, US 4 13
Panjwani, Nadeem Dallas, US 12 15
Patil, Vinod Dallas, US 7 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00