Wire harness manufacturing system, conveyance device, routing processing device, examination device, and work board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11776713
SERIAL NO

17128931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wire harness manufacturing system including a plurality of processing zones and configured to manufacture a wire harness by using a subassembly including a plurality of electrical lines to each of which a connection component is attached includes a conveyance device provided along the plurality of processing zones and including: work boards in a number at least corresponding to the number of the plurality of processing zones; a circulation conveyer configured to sequentially convey each work board in a horizontal state from an upstream side to a downstream side on a downstream conveyance path along the plurality of processing zones and then return the work board from the downstream side to the upstream side on an upstream conveyance path; and a raiser configured to set the work board to a stand-up state in which one of edge parts extending in a conveyance direction of the work board is positioned on an upper side of the other edge part in the work board, and to set the work board in the stand-up state to the horizontal state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FURUKAWA ELECTRIC CO., LTD.; FURUKAWA AUTOMOTIVE SYSTEMS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akai, Mitsuyuki Inukami-gun, JP 1 2
Aramaki, Eiji Inukami-gun, JP 7 30
Kato, Koji Inukami-gun, JP 221 2108
Minami, Nobuyuki Inukami-gun, JP 51 395
Okubo, Takayuki Inukami-gun, JP 20 85

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00