Perovskite material photovoltaic device and method for assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11659723
APP PUB NO 20210143350A1
SERIAL NO

16682254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a photovoltaic device includes fabricating a first photovoltaic device portion with a first perovskite material layer having a first face, and fabricating a second photovoltaic device portion with a second perovskite material layer having a second face. Then first photovoltaic device portion and the second photovoltaic device portion are arranged such that the first face is in contact with the second face. Finally, the first photovoltaic device portion and second photovoltaic device portion are compressed at a pressure sufficient to fuse the first perovskite material to the second perovskite material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUBICPV INC1807 ROSS AVENUE SUITE 333 DALLAS TX 75201

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Holland, Michael Lancaster, US 95 2189
Irwin, Michael Heath, US 7 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00