Method for embedding a component in a base

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8368201
APP PUB NO 20110266041A1
SERIAL NO

13185165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, in which the semiconductor components forming part of an electronic circuit, or at least some of them, are embedded in a base, such as a circuit board, during the manufacture of the base, when part of the base structure is, as it were, manufactured around the semiconductor components. Through-holes for the semiconductor components are made in the base, in such a way that the holes extend between the first and second surface of the base. After the making of the holes, a polymer film is spread over the second surface of the base structure, in such a way that the polymer film also covers the through-holes made for the semiconductor components from the side of the second surface of the base structure. Before the hardening, or after the partial hardening of the polymer film, the semiconductor components are placed in the holes made in the base, from the direction of the first surface of the base. The semiconductor components are pressed against the polymer film in such a way that they adhere to the polymer film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IMBERA ELECTRONICS OY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tuominen, Risto Helsinki, FI 50 1630

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00