Continuous assessment of well elements using fiber optics

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11795812
APP PUB NO 20210222540A1
SERIAL NO

17075166

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A well system includes a fiber-optic cable positionable downhole along a length of a wellbore. The well system further includes an opto-electrical interface to communicatively couple to the fiber-optic cable to monitor a gas released from a well element within the wellbore. Further, the well system includes a processing device and a memory device that includes instructions executable by the processing device. The instructions cause the processing device to detect hydrogen absorption by the fiber-optic cable within the wellbore and determining a location of deterioration of the well element using the detected hydrogen absorption by the fiber-optic cable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LANDMARK GRAPHICS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Badis, Chafaa Lons, FR 4 3
Choksey, Kashyap Sugar Land, US 2 3
Kroczka, Sebastian Cracow, PL 3 3
Maida, John Houston, US 6 151
Souza, Welton Danniel Dan Haag, NL 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00