Peak power management of dice in a power network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11454941
APP PUB NO 20210011442A1
SERIAL NO

16510662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Exemplary methods, apparatuses, and systems include a first die in a power network receiving, from each die of a plurality of dice in the power network, a first signal indicating that the respective die of the plurality of dice is in a high current state or a second signal indicating that the respective die of the plurality of dice is an active current state. The received signals include at least one second signal. The first die determines, based upon the received signals, a number of dice of the plurality of dice that are currently active and selects an activity threshold based upon that number. The first die further determines an activity level for the power network and transmits, to the plurality of dice, the first signal indicating that the first die is in the high current state in response to determining that the activity level is less than the activity threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Palmer, David A Boise, US 42 570
Parry, Jonathan S Boise, US 105 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00