Fuel cell system and exhaust gas treatment device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11749819
APP PUB NO 20230043105A1
SERIAL NO

17525217

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a fuel cell system including: an air supply line configured to supply air to a fuel cell stack; a discharge line connected to the fuel cell stack and configured to guide exhaust gas discharged from the fuel cell stack; a discharge adapter connected to the discharge line and configured to discharge the exhaust gas to the outside; and a bypass line having one end connected to the air supply line and the other end connected to the discharge adapter, the bypass line being configured to selectively allow the air to flow from the air supply line to the discharge adapter, thereby effectively reducing a hydrogen concentration in exhaust gas discharged from the fuel cell stack.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYUNDAI MOBIS CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Woo, Myeong Nam Yongin-si, KR 17 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00