Single stage synchronous generalized regulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11855545
SERIAL NO

18464220

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A voltage controlled bridge is coupled to a line voltage and a transformer primary harmonic voltage, and a current controlled bridge is coupled to a line current and a transformer secondary harmonic voltage. A synchronous average harmonic current compensator integrates error between a measure of bridge current and commanded current synchronously over each half of a switching period and samples compensator output to control line current and linearize harmonic coupling between isolated bridges. A synchronous pulse width modulation process tracks commanded line voltage. One or more of a primary harmonic command circuit and secondary harmonic command circuit adjust the harmonic coupling voltage of the voltage controlled and current controlled bridge respectively. Line voltage, line current, and primary and secondary harmonic commands provide generalized line and isolated voltage bus regulation degrees of freedom in a single stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZUREK LEE FREDRIKGROTON CT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mazurek, Lee Fredrik Groton, US 8 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00