System control device and method of system control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11394238
APP PUB NO 20200266659A1
SERIAL NO

16618951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention includes a hunting determination unit configured to determine whether hunting has occurred or not for each of control devices in a power transmission and distribution system based on a control history of the control devices, a time constant calculation unit configured to calculate an adjustment time constant in which a time constant of the control device having state information indicating a state of the control device, with a high significance level, is increased, when the hunting determination unit determines that the hunting has occurred in one or more of the control devices, and a time constant transmission unit configured to transmit the adjustment time constant to the control device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takano, Tomihiro Tokyo, JP 9 39
Ueda, Kenji Tokyo, JP 283 3073

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00