Method for producing a motor rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9015926
APP PUB NO 20140041207A1
SERIAL NO

14113040

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method for producing a motor rotor, a lamination stack made up of stacked thin steel sheets each formed with a through hole, the lamination stack having a shaft bore formed of the through holes aligned with one another, is retained as a rotor core in a thickness direction with a pair of jigs from both sides, and a shaft is inserted into the shaft bore and joined to the lamination stack by shrink fitting. Each jig includes a shaft hole, a radially inner peripheral portion for holding a peripheral edge of the shaft bore of the lamination stack at a position, in a radial direction of the shaft hole, surrounding the shaft hole radially inside; and a radially outer peripheral portion for holding the outer periphery of the lamination stack. The radially inner and outer peripheral portions are positioned at different heights in a jig height direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuno, Koji Nagoya, JP 93 1745
Matsushita, Masayuki Toyota, JP 42 574
Murayama, Kimimasa Toyota, JP 5 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00