In-wafer reliability testing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11543453
APP PUB NO 20200241071A1
SERIAL NO

16730047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit includes a semiconductor die having conductive pads and an electronic component with a first terminal coupled to a third conductive pad and a second terminal coupled to a fourth conductive pad. A resistor has a first terminal coupled to the fourth conductive pad and a second terminal coupled to the fifth conductive pad, and a first transistor has a first terminal coupled to the first conductive pad, a second terminal coupled to the fifth conductive pad, and a control terminal. A second transistor has a first terminal coupled to the first transistor, a second terminal coupled to the third conductive pad, and a control terminal. A pulse generator has an input coupled to the second conductive pad and an output coupled to the control terminal of the second transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TEXAS INSTRUMENTS INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ramadass, Yogesh Kumar San Jose, US 42 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 3, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00