Bollard setting and installation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11708705
SERIAL NO

17460477

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bollard setting and installation system for efficiently installing a bollard wall without any restrictions relating to proximity to water or flood plains. The bollard setting and installation system generally includes a setting frame which is positioned on a ground surface. A plurality of bollards is positioned on the setting frame in a desired spacing and orientation to form a bollard wall. A vehicle having a vehicle arm connected to a lifting frame is positioned such that the bollards are secured to the lifting frame by clamps in the desired spacing and orientation. The vehicle may then move the lifting frame to position the lower ends of the bollards in an opening in the ground surface. Concrete may be poured to encapsulate the lower ends of the bollards. The lifting frame may then be removed, with the bollard wall being free-standing in the ground surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TGR CONSTRUCTION, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fisher, Thomas G Dickinson, US 16 32
Schafer, Gregory L Dickinson, US 19 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00