Pressure transducer with integral bleed valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11686641
SERIAL NO

17536316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosed technology is a pressure transducer with a bleed valve built into the body of the transducer for purging liquid systems. The transducer assembly includes a body, a bleed valve port defined in the body and configured to accept a bleed valve, an interface port attached to the body, an adapter attached to a portion of the interface port, a header attached to the adapter and the body, a pressure transducer mounted to the header, and an internal cavity in communication with the interface port, the pressure transducer, and the bleed valve port. The bleed valve port is configured to vent a gas from the internal cavity. A bleed valve disposed in the bleed valve port is configured to controllably vent a gas from the internal cavity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KULITE SEMICONDUCTOR PRODUCTS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DeRosa, Louis Wayne, US 57 129
Gardner, Robert Westwood, US 103 1450
Geras, Elias Pearl River, US 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00