Display substrate and display device each including blocking part

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11251250
APP PUB NO 20210143240A1
SERIAL NO

16634297

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display substrate and a display device are provided. The display substrate includes a base substrate; a first electrode, located on the base substrate; a second electrode, located on the base substrate, an orthographic projection of the second electrode on the base substrate being adjacent to an orthographic projection of the first electrode on the base substrate; and a conductive layer, including a blocking part between opposite side surfaces of the first electrode and the second electrode, the conductive layer being grounded, and every two selected from the group consisting of the first electrode, the second electrode, and the conductive layer being insulated from each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT BEIJING CITY BEIJING CITY 100015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chan, Yu Cheng Beijing, CN 5 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00