Timing control device and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11862065
APP PUB NO 20220293028A1
SERIAL NO

17692190

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A timing control device for the display panel includes a control circuit. The control circuit is configured to generate a plurality of gate scanning control signals and a data transmission control signal. In response to that a display refresh rate changes from a first frequency to a second frequency, the control circuit adjusts the plurality of gate scanning control signals to generate a plurality of adjusted gate scanning control signals, or adjusts the data transmission control signal to generate an adjusted data transmission control signal, for driving a display panel under the second frequency as the display refresh rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NOVATEK MICROELECTRONICS CORP2F NO 13 INNOVATION ROAD I SCIENCE-BASED INDUSTRIAL PARK HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Grace Taipei, TW 14 51
Liao, Yen-Tao Hsinchu, TW 29 26
Su, Yu-Hung Hsinchu, TW 89 623
Yang, Jen-Ta Hsinchu County, TW 15 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00