Cooling section with coolant flows which can be adjusted using pumps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11167332
SERIAL NO

17261080

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling section arranged within, upstream of, or downstream of a rolling train is provided. A hot-rolled product made of metal is cooled by the cooling section. Application devices of the cooling section are supplied with an actual current of a water-based liquid coolant via a supply line and a pump. The actual current of the coolant is applied to the hot-rolled product by means of the application device. The hot-rolled product is transported within the cooling section in a horizontal transport direction during the application of the coolant. A controller of the cooling section dynamically ascertains a target actuation state for each pump on the basis of a target current of the coolant to be applied onto the hot-rolled product by the application device and controls the pump in a corresponding manner such that the actual current delivered by each pump approximates the target current as much as possible.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PRIMETALS TECHNOLOGIES GERMANY GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Weinzierl, Klaus Nuremberg, DE 39 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 9, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 9, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 9, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00