Logic chip including embedded magnetic tunnel junctions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997563
SERIAL NO

15596650

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment integrates memory, such as spin-torque transfer magnetoresistive random access memory (STT-MRAM) within a logic chip. The STT-MRAM includes a magnetic tunnel junction (MTJ) that has an upper MTJ layer, a lower MTJ layer, and a tunnel barrier directly contacting the upper MTJ layer and the lower MTJ layer; wherein the upper MTJ layer includes an upper MTJ layer sidewall and the lower MTJ layer includes a lower MTJ sidewall horizontally offset from the upper MTJ layer. Another embodiment includes a memory area, comprising a MTJ, and a logic area located on a substrate; wherein a horizontal plane intersects the MTJ, a first Inter-Layer Dielectric (ILD) material adjacent the MTJ, and a second ILD material included in the logic area, the first and second ILD materials being unequal to one another. Other embodiments are described herein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORP.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Epple, John H Portland, US 7 94
Ghani, Tahir Portland, US 698 6983
Lee, Kevin J Beaverton, US 73 1109
Steigerwald, Joseph M Forest Grove, US 35 832
Wang, Yih Portland, US 237 699

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00