Disintegrated and decompacted cellulose-based vegetable fibre materials use and method for acquisition and production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11525013
SERIAL NO

16498474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to separated, decompacted, cellulose-based fibres acquired from a vegetable raw material, wherein the separated, decompacted, cellulose-based fibres have an aspect ratio after soaking in water of longitudinal diameter to transverse diameter of 1:1 to 1000:1 and a water-binding capacity of >200 wt. % and a water retention capacity of >50%, and a method for acquiring and producing these separated, decompacted cellulose-based fibres. The purification method involves incubation of the vegetable material with an aqueous decomposition solution containing at least one dissolved amino acid and/or peptide with 2-50 amino acids to decompose the compacted cellulose-based fibres.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dietz, Max Wiesbaden, DE 8 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00