Array substrate, manufacturing method thereof, and display apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11581342
SERIAL NO

16485286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An array substrate includes a substrate, a protection layer, and a photodiode. The protection layer is disposed over the substrate, has a single layer-structure, and is provided with a through-hole therein. The photodiode includes a lower electrode, a PN junction and an upper electrode, which are sequentially over the substrate. The PN junction is within the through-hole. The protection layer and the PN junction of the photodiode have a substantially same thickness. The array substrate further includes a thin-film transistor over the substrate. An orthographic projection of an active layer of the thin-film transistor on the substrate does not overlap with an orthographic projection of the PN junction of the photodiode on the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BOE TECHNOLOGY GROUP CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Guoqiang Beijing, CN 209 2629

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00