Heated cable cover for gutter debris preclusion devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11459762
APP PUB NO 20200181914A1
SERIAL NO

16708371

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention includes a cover for use with a heat element and gutter debris preclusion devices. The cover includes a body, a front member, and a middle portion disposed between the body and the front member. The body includes a lip being operably configured to extend beyond an outer edge of the gutter when the cover is in use. The cover also includes a channel defined by the middle portion and at least the front member, wherein the channel is operably configured to receive the heat element. The cover is operably configured to hold the heat element to the gutter debris preclusion device. When the heat element is energized it will generate heat. The cover will enable the generated heat to transfer to the gutter debris preclusion device and to a gutter to which it is attached.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GUTTERGLOVE, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lenney, Robert C Lincoln, US 52 615

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00