System to achieve full combustion turbine load in HRSG limited combined cycle plants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11892160
SERIAL NO

17901311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of suppressing steam production in a HRSG where a volume of feed water is diverted upstream bypassing a portion of the economizer and returning the volume of diverted feed water to a downstream portion of the economizer. A control logic circuit is used to manipulate a suppression control valve regulating the bypassed feed water, thereby reducing the temperature of water in the steam drum. Bypassing feed water flow into a downstream portion of an economizer reduces the steam production rate in the steam drum by increasing the evaporator approach temperature, permitting gas turbines to operate at base load even after an upgrade, by preventing the waste heat boiler from exceeding its rated capacity and pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HRST INC6557 CITY WEST PKWY EDEN PRAIRIE MN 55344

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Almberg, Evan Woodland Park, US 1 0
Craig, Bryan Oldsmar, US 1 0
Ferris, Victor Minneapolis, US 2 3
Kumar, Anand Gopa Savage, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 6, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00